Racking, Mezzanine floor & conveyor system
Full racking, mezzanine floor and gravity fed conveyor system and material handling.
This was a great project for Big Box Group where we were able to offer a real end to end solution. The project consisted of 2 mezzanine floors with dimensions as follows:
1st floor – 2 levels @ 900 Sq Metres
2nd floor – 1 level @ 67 Sq Metres
A Spiral Conveyor, 236 bays of pallet racking with various beam configurations and rack end protectors.
We were able to offer all of the elements required in a full service solution unlike a lot of other suppliers where the job would have had to be separately sourced. We worked closely with the client providing a same day reply service and a full schedule of works for the entire project.
Options and solutions were provided for all stages of the project with regular customer contact and site visits.